top of page

Pallet racking to be disassembled and disposed of.
Swindon ( Before).

This photo shows the mezzanine floor that had to be disposed of with office building
Swindon ( Before)

Project finished, complete removal of racking and mezzanine floor as required by client.
After ( Swindon)

Pallet racking to be disassembled and disposed of.
Swindon ( Before).
1/7
SWINDON CLEARENCE
This project involved the complete clearance of pallet racking, mezzanine floor structure with office,and general waste products, removed and disposed of. Area had to be cleaned and made good for re-letting.all achieved to the satisfaction of clients specifications.
Please view photos before and after
bottom of page